PG&E MSA 2021-2023 C25379
Since 2013 Hanford has been supporting PG&E’s construction projects performing BMP Installation services in support of PG&E’s operations, maintenance, and construction activities. In addition to BMP Installation, other services provided include maintenance and removal of BMPs as well as post construction site stabilization.
Montage Healdsburg Resort: Erosion Mitigation and Management
Hanford ARC was contracted to assist with the management and mitigation of the erosion caused by soil disturbing development on site. Tasks included the installation of sediment perimeter controls and high visibility fencing along all resort roads.
Post Fire Recovery Hydroseeding, Spring Mt. Road
This project was focused on the restoration and stabilization for post fire recovery of the 2020 Glass Fire wildfire in Northern California, that started on September 27, 2020 and remained active for 23 days.
TMP210 Topographical Restoration AT Millerton NPS Parcel
Prior to work, at least seven existing rock bollards located at the road entrance to the project site would need to be moved temporarily to one side and later replaced, and untrenched, stapled silt fencing will need to be installed at the southern end of the site closest to Tomales Bay.
North Mare Island Levee Repair
Mobilization; setup and maintenance of wildlife exclusion fencing; developing and implementing a water pollution control program; excavating a starter trench and removing oversize material or debris which could impede the installation of sheet piles…