Dry Creek Habitat
Excavation of backwater alcoves and side channels into the floodplain areas of Dry Creek, installation of habitat and stabilization structures composed of logs and boulders, driving logs into the ground to stabilize log structures, stabilization of banks, planting and replanting riparian vegetation and trees, removal of non-native riparian vegetation, construction of in-channel features such as boulder fields and riffles, dewatering during construction, isolation of work areas from the creek, construction of driveway access from West Dry Creek Road, and replacement of storm drain pipe.